Civil & Environmental Engineering
Bondurant - Grain District Silo Adaptive Reuse
For their capstone project, Civil and Environmental Engineering students examined potential reuse of two six-pack silos in Bondurant.
Bondurant - Cleaveland Park Improvements
For their capstone project in Civil and Environmental Engineering, a team of students evaluated upgrades to enable future improvements for Cleaveland Park in Bondurant.
Stormwater constraints currently restrict improvements to Cleaveland Park. Students evaluateed potential stormwater upgrades within the park parcel and the surrounding area that could enable future park improvements. Students prepared detailed design plans to support development of Cleaveland Park as a neighborhood public amenity.
Bondurant - Trail Design Projects
For their capstone project in Civil & Environmental Engineering, a team of students designed multi-use trail connections and trail segments as well as developed engineering designs and cost estimates for the City of Bondurant.
As a growing community, Bondurant has the opportunity to increase recreation opportunities for residents and visitors. This project included the following components:
Manchester Riverbank Parks Engineering and Design
For their capstone project in Civil and Environmental Engineering, a team of students created designs for an underutilized greenspace in Manchester adjacent to the Maquoketa River.
Bloomfield - Lake Fisher Park Engineering & Design
As part of their Senior Design Capstone Course, Civil & Environmental Engineering students designed improvements to Lake Fisher Recreation Area in Bloomfield, Iowa.
West Branch – Sanitary Sewer Trunk Line Engineering and Design
As part of their Senior Design capstone course, Civil and Environmental Engineering students provided analysis, recommendations, designs, and costs for extending West Branch's sanitary sewer trunk line to meet the needs of the growing community.
West Burlington - Downtown Streetscaping
The City of West Burlington sought an evaluation and redesign of its downtown area to enhance functionality and visual appeal, facilitate public events, attract visitors. For their capstone project, a group of Civil and Environmental Engineering students designed multiple components for the downtown area, including green medians, permeable paved roadways, covered parking, a pedestrian walkway, and reconfigured parking.
Burlington - South Riverfront Park Redesign
For their capstone project in Civil and Environmental Engineering, a team of students created engineering and design plans for a park to be located on a former industrial site. Located adjacent to the Mississippi River, the project had several obstacles, notably possible soil contamination and flooding. The team reviewed the site, selected amenities that worked with these challenges, and made recommendations for ways to incorporate the historic rail yard that formerly stood at the site.
Burlington - Parks and Forestry Facility Design and Engineering
For their capstone project, three senior Civil and Environmental Engineering students designed a Parks and Forestry facility that prioritizes energy efficiency, long-term durability, and architectural integration with the natural park environment in which the facility will be located.
Burlington - Industrial Building Adaptive Reuse
Several former industrial buildings are in close proximity to the central downtown of the City of Burlington. Currently unused, the city is seeking to revitalize the area and adapt the structures to new purposes. For their capstone project in Civil & Environmental Engineering, a trio of students designed an adaptive reuse plan for the Dial Soap Factory, a 1.28-acre site on a prime location.
New Sharon - Subdivision Design and Engineering
As part of the senior design capstone project, students in Civil and Environmental Engineering designed a new subdivision on a greenfield site in New Sharon, Iowa.
New Sharon - City Hall Improvements
The City of New Sharon sought to renovate the building that currently houses its city hall to include other city offices, including the police department and public library. For their capstone project, three students in Civil & Environmental Engineering assessed the building and created plans to increase its interior footprint. Their designs provide an ADA-compliant elevator, a new garage for police vehicles, and exterior repairs to ensure the structure's longevity.