Perry Creek Flood Control and Design

Academic Year 
2014-2015
College/Department 
College of Engineering - Department of Civil and Environmental Engineering
Project Partner 

Widening, straightening, embankment work, conduit reconstruction, levees, drainage structures, public and private utilities relocation, bridges, street construction, and appurtenant flood control measures to protect persons and property in the Perry Creek Valley. The project starts at the Missouri River and continues north upstream to the city limits. Phases 1 through 4 are complete. The Phase 4 Levee raise was completed to 23rd Street in 2012.

Phase 5 work on Perry Creek would be north Stone Park Boulevard. City staff is continuing to evaluate improvements to reduce flooding and flood zones within the city limits. Nearly 400 parcels are left to evaluate for protection. Evaluations of this area will be conducted in FY2014 as part of the Dearborne and 38th Street bridge design. Platting of the Perry Creek as a designated parcel or series of parcels that accurately reflect the creek cross section remains to be completed. This will allow for the disposal of the remnant properties. There are also plans to extend the Perry Creek trail connection north of Stone Park Boulevard.